Closing in on this one, finally.
And yes, it does feel like it's all over but the crying. Still left to do:
1. Clean grout joints
2. Caulk edges
3. Grout joints
4. Waterproof grout
5. Install finish plumbing, including replacing the broken tub drain ring (for which I bought a $24 tool at Home Depot).
Then there's the plastering and painting, plus a little electrical work (replacing outlets) and other miscellaneous cleanup and prettifying. But it is a big relief to have the tile done. It took a lot longer to finish than I anticipated it would. I had to cut the last round of tile in below-freezing weather, which was not fun.
But I think it's worth it.
And oh yeah:
6. Repair kitchen ceiling from where water dripped through from the offending bathroom. I'm about 98% I got that leak fixed by repairing the subfloor before I did the floor tile.
And if I didn't well, this: