In that project phase where the door had to go in order to get the tile laid, so it's a mess.
Though it looks like I could lay a few more full tiles close to the door, the space is just a bit too short. I'll put the door back on before I do the grout, because nobody wants the door hanging out forever before I grout. The grout is supposed to be glow-in-the dark, and that works because the bathroom will be Dr. Who themed. Whether or not the grout actually will glow is up in the air. We'll see what happens. Also, I don't have a lot of it.
Meanwhile, I'm waiting on a delivery of more home network parts so I can keep that little project going too. I have at least one more length of ethernet I want to string, and I'm thinking I'll relocate a light in the hallway as I do that part, since I'm cutting holes in the ceiling anyway.
The floor isn't as level as I'd like it to be, but I think it'll still work. It's more level than it was to begin with.
No comments:
Post a Comment