Friday, February 14, 2025

More Floor Scraping


So I'm back to scraping the bathroom floor, now that the concrete has set. I think I've got enough scraped that I can start putting on the floor leveler, but we'll see how things look in the morning. The foam along the edges is there to stop the floor leveler from flowing where it shouldn't flow.

My goal is to have the floor leveler applied by noon tomorrow. If that goes well, next weekend I'll take down the drywall on the south wall, put in the ethernet cabling I want to and insulate it so I don't hear pooping sounds in the study.

No comments: