The plumbers did indeed come today, and left with:
1. A tub that drains and will hold water when wanted.
2. Valves for the sink and toilet that do not leak when turned off.
3. The aforementioned toilet hole, ready to receive the toilet.
They also secured the feed line for the toilet so it doesn't rattle in the wall.
There is still work for me to do to get the room back in use. First task is to cement up the hole:
We saved a little money not having the plumbers do it, and like Klinger I can say "I know concrete, it's not that hard!"
They did have to do a lot more digging that I thought, but they encountered a DIY plumbing job that was mostly fittings so they had to cut a lot out in order to get things put back together.
Also on the agenda: insulating that wall. It's more for soundproofing than anything else.
And wiring. And Ethernet cables for the home network. Lots of work to do.